Your lead service line inventory and plan are due November 1, 2027.
EPA's Lead and Copper Rule Improvements require every public water system that serves homes, schools, or workplaces to file an updated service line inventory and a replacement plan, and to send customer letters. We prepare all three from the records you already have.
349 days left. Or email tylerjameswoody@gmail.com
Source: LCRI final rule, Federal Register, October 30, 2024. Your State may set earlier dates.
155 lines count toward replacement until the unknown ones are checked. Because this town has lead lines on record, each of the 118 unknowns is checked individually, by records or a look at the pipe.
What's due on November 1, 2027
Three things, all built from the same inventory.
Baseline inventory
Every service line, both the system's side and the customer's, classified as lead, galvanized requiring replacement, non-lead, or unknown. Lead connectors too.
40 CFR 141.84(a)
Replacement plan
How you'll identify unknown lines, replace lead and galvanized lines within ten years, set priorities, pay for it, and tell customers. Made public.
40 CFR 141.84(c)
Customer notices
A letter to everyone served by a lead, galvanized, or unknown line within 30 days, then every year, with the health information the rule requires.
40 CFR 141.85(e)
How it works
- Step 1
Send your spreadsheet
The inventory you filed in 2024 is the starting point: Excel or CSV, in the State template or your own layout.
- Step 2
We sort every line
Each line gets its category from its pipe materials, with the reason recorded.
- Step 3
Shrink the unknowns
Records and inspections clear lines that aren't lead. In Washington, a random-sample method (DOH 331-723) can too, when no lead has been found.
- Step 4
You review and submit
A Word plan you can edit, printable letters, and a public inventory page.
Free tools
No sign-up. Each one shows the rule it's based on.
- What's due for my system
Look up your water system and see every date that applies.
- Replacement pace calculator
How many lines you must replace each year to finish by 2037.
- Washington sample size calculator
How many unknown lines DOH's statistical method asks you to dig up.
Plain-language guides
Every statement links to the rule it comes from.
- What's due by November 1, 2027, and what's due now
The LCRI deadlines, the 2024 rules that apply until then, and the yearly cycle after.
- The four service line categories
Lead, galvanized requiring replacement, unknown, and non-lead, and how each is decided.
- Resolving unknown service lines
Records, field checks, and Washington's statistical method: how to shrink the unknowns.
- What goes in a service line replacement plan
Every element the rule requires, and the yearly update after you submit it.
Find out where your system stands
Email your current inventory and we'll reply with a summary: how many lines count toward replacement, which unknowns could be cleared from records or inspections, and what's left before the deadline. No charge, no obligation.
Prefer email? Write to tylerjameswoody@gmail.com.